To Do:
- Gut the mudroom. Finalize contractors for electric and sheetrock. I already have them picked, I just need to get the contracts signed and deposits made.
- Kitchen: repair kitchen wall, lay new kitchen floor - still deciding on type of floor, remove soffit, replace soffit if necessary, install small cabinets above refrigerator, paint cabinets, replace cabinet hardware, re-assemble cabinets, install water lines for refrigerator, install garbage disposal, paint.
- Dining Room: replace ceiling tile with sheetrock, resand floor, refinish floor, install crown molding, demo built in cabinet and create small desk area, wall paper one wall, paint.
- Living Room: Install Ikea shelves to look like built ins, address fireplace - no clue what I'm going to do here yet, install crown molding, paint.
- Stairway: replace ceiling tiles with sheetrock, paint.
- Upstairs hallway: Remove drop ceiling, install 2 lighting fixtures in ceiling, replace one lighting fixture, paint, add wall trim in interesting pattern.
- Ryan's room - Paint, Decorate
- Owen's Room - Paint, Decorate
- Bathroom - Address window frame in shower, Install over toilet storage, address shelves and shelf door
- Master bedroom - Install Crown Molding
- 3rd floor Stairway - Shore up banister, Remove paneling and frame out ceiling and sheetrock
- Guest room - Paint, install moldings, Install Plank Floor
- Office - Paint, Install Moldings, Install Plank Floor
- Outside - Prune, Weed, Edge Grass, Tear down platform that was built in back to support a child's pool (pics to come)
No comments:
Post a Comment